Building a Detailed Budget in Kuali Research
This guide provides concise, step-by-step instructions for creating a detailed budget in Kuali Research. For more complex scenarios, refer to the searchable PDF guide. Instructional videos are available for adding personnel, using auto-calculate, and applying details to later periods.
1
Create a Budget
- Navigate to the Budget Panel within your proposal.
- Click +Add Budget.
- Enter a Budget Name, select Start a Detailed Budget, and click Create Budget.
2
Add Personnel
- Review the Project Personnel section for listed individuals (e.g., PI, Co-Is).
- Click Add Personnel to include employees or "To Be Named" roles.
- Use the Search feature to locate employees or manually add placeholders.
Refer to the instructional video on adding personnel for a walkthrough.
3
Edit Personnel Details
- Click Details next to each individual to verify or edit:
- Appointment Type
- Base Salary (auto-populates)
- Salary Effective Date and Anniversary Date
- Save changes before proceeding.
4
Assign Personnel to Budget Periods
- Open the Assign Personnel to Periods panel.
- For each person, enter:
- Object Code (type of compensation)
- Start/End Dates
- Effort % (time dedicated)
- Charged % (portion paid by sponsor)
- Click Assign to Period and repeat as needed.
See the auto-calculate instructional video for guidance on this feature.
5
Add Non-Personnel Costs
- Navigate to the Non-Personnel Costs panel.
- Click Assign Non-Personnel.
- Select Object Code Name and enter the Total Base Cost (e.g., Equipment, Travel, Tuition).
6
Auto-Calculate Budget Periods (Optional)
- Click Auto-Calculate Periods to copy Period 1 budget lines to future periods. A 3% inflation rate is applied by default.
Refer to the auto-calculate instructional video for detailed steps.
7
Review and Complete Budget
- Open the Budget Summary panel to review all entries.
- Click Complete Budget and certify when prompted.
- Select Return to Proposal to finalize.
Notes and Hints
- Manual Entries:
Entering data in later periods disables auto-calculation. - Apply to Later Periods:
This feature copies data to future periods but disables auto-calculation.
Refer to the instructional video for using this feature. - Subawards, Modular Budgets, Cost Share:
For more information on these topics, refer to the searchable PDF guide.